01 / 09
EVALUATION BRIEF

SiteMarker vs Forma (ACC Build):
What Your Project Teams Actually Need

A detailed comparison for Ardurra's technology evaluation team. SiteMarker isn't another project management tool - it's field intelligence and documentation infrastructure that supports your teams from design through closeout.

Prepared for: Ardurra Group Date: April 2026 From: SiteMarker

The biggest challenge isn't organizing RFIs - it's preventing them.

Tools like Forma help organize RFIs and submittals - but that's not Ardurra's primary challenge. As the engineer, you answer RFIs, not generate them. The real challenge is minimizing RFIs by improving field visibility - something document-based systems make difficult:

📋

Constrained by the Document

Document-based systems like Forma capture only the highest-level information. You're constrained to RFI and submittal workflows - missing everything else happening on site.

⚠️

Defensibility Has Gaps

Forma's documentation is limited to the workflows it was built for. Conditions observed in the field from existing conditions through closeout go uncaptured - that's a liability gap.

🔍

Leadership Can't See the Field

Consuming a project through task lists and RFI logs doesn't give leadership an intuitive picture of what's actually happening on site.

📱

Tools Don't Match the Workflow

Heavy systems require behavior changes and become "another tool" that people resist adopting. Compliance drops off.

"Forma manages documents.
SiteMarker captures reality in the field."

This isn't a decision between two PM tools. Forma is document and workflow management - tasks, checklists, coordination. SiteMarker is field intelligence infrastructure: richer on-site data capture from existing conditions through design, construction, and closeout that improves defensibility and mitigates risk.

We design and construct the project as a whole - not by sheets, not by lists.

Capability
Forma (ACC Build)
SiteMarker
Real-Time Field Documentation
Only begins once construction starts - misses design, permitting, and pre-construction phases
Full lifecycle - documentation from design through construction and closeout
Geolocated Site Intelligence
No location-based pinning on project maps
Pins tie location + photo + context on aerial/plan overlays
Reports
Generates reports, but less actionable, less intuitive, and poor formatting
Reports auto-generated from field data - actionable, formatted, and ready to share
Defensible Documentation
Constrained to the workflows Forma was built for - RFIs and submittal management
Timestamped, location-based records of conditions, conversations, issues & progress
RFI Prevention
Organizes RFIs after they're created
Better field visibility minimizes and prevents RFIs before they happen
Leadership Visibility
Consumed through task lists and RFI logs - shows what's supposed to happen
Consume the project as a whole through a map - see what actually happened
Adoption & Ease of Use
Heavy system; significant behavior change required
Fits existing behavior - walking sites and taking photos, just smarter
CAD / GIS Overlay
No integrated GIS viewer
Layer site plans directly on aerial maps for integrated field workflows

With SiteMarker, your report is done before you leave the site.

SiteMarker replaces the entire post-visit documentation cycle with a single, natural workflow - from design verification through closeout.

1

Walk the Site

Open SiteMarker on your phone or tablet. Your project map loads with aerial imagery and plan overlays.

2

Drop Pins as You Go

Tap to drop geolocated pins. Attach photos, notes, and context in real time. Every observation is tied to a precise location.

3

Report Generates Automatically

Walk off the site and your report is done. Timestamped, location-tagged, and ready to share - no desk time required.

Why This Matters for Ardurra

🛡️

Risk & Liability Protection

Every observation creates a timestamped, geolocated, defensible record. In a dispute, you can go back and prove exactly what conditions existed, what was discussed, and when.

Critical for utilities, civil & municipal work
📊

Real Visibility for Leadership

Executives and PMs can sit in the office and actually see where projects stand - based on real field data, not status updates. Eliminates schedule blind spots and "yeah, we're done" syndrome.

No more misreported progress

Effortless Adoption

Your team already walks sites and takes photos. SiteMarker wraps around that existing behavior and makes it smarter. No heavy implementation, no behavior change, no training headaches.

"It doesn't add time - you're standing there anyway"
🌐

Full Lifecycle Coverage

Document-centric tools like Forma constrain visibility to high-level information. SiteMarker captures what's actually happening in the field - from design verification through construction and closeout - giving Ardurra complete coverage where it matters most.

Design through closeout, not just construction

Results from firms like yours.

Multi-discipline engineering firms managing utility, infrastructure, and municipal projects use SiteMarker to eliminate documentation overhead and strengthen field intelligence.

3hrs
Average report time eliminated per site visit
218
Working hours saved on a single project
27
Site violations avoided through better documentation
Samantha Eaton
Landscape Architect

“Where has this been all of my career? Now having this as a tool is incredible.”

Michael Drexler
Technical Sales Representative

“I literally go back to the truck, refine my notes…issue the report right there - and then I leave.”

Jason Quick
Sen. Construction Manager, Buford Jasper Water & Sewer Authority

“If I were to take it away…half of them would probably quit.”

This isn't marginal efficiency. It's real capacity creation.

For a firm the size of Ardurra, the compounding impact is transformative.

2–3 hrs
Saved per site visit
×
10–15
Projects per PM
×
4–5
PMs per team
=
100–225 hrs
Recovered per team per month

That's the equivalent of 1–2 additional full-time employees worth of capacity - per team - without a single new hire. Across Ardurra's portfolio of offices, this compounds dramatically.

Before you lock into Forma,
see what you'd be missing.

We're not asking you to choose between two PM tools. We're asking you to solve the problem Forma doesn't touch: field visibility, defensible documentation, and intelligence that spans design through closeout.

Virtual Demo April 21, 2026
Format 30-min working session
Website sitemarker.com

The recommended ask: "Before we finalize on Forma, I think we should evaluate how we're handling field documentation across the full project lifecycle. I saw a platform that completely changes how our project teams capture site data in real time. It's worth 30 minutes to see alongside Forma."